Scenery and Structures

Casting Plaster Rock Faces for Model Railroad Scenery

Learn how to cast plaster rock faces for model railroad scenery with rubber moulds and Hydrocal: straight casting, casting in place, colouring and fixes.

On this page
  1. Why cast your own rock
  2. What you need
  3. Buying or making moulds
  4. Method 1: straight casting
  5. Method 2: casting in place
  6. Installing and blending
  7. Colouring the rock
  8. Troubleshooting
  9. Safety and cleanup

Why cast your own rock

Mountains and cuttings are built from layers of stone, and rock faces make a layout look instantly more natural. Casting plaster rocks from moulds is one of the most popular ways to build them. It is quick, inexpensive once you have a mould, and each mould can produce many castings.

One club modeller’s summary is useful: what makes a rock look like a rock is mostly shape and texture, plus colour. The material underneath matters less. Plaster, foam and carved materials can all work, as long as the texture and colour are right.

What you need

  • Rubber or latex rock moulds. Several manufacturers sell moulds in different sizes and rock styles, and many are cast from real rock.
  • Casting plaster. Hydrocal is a common choice. It is a fine, hard-setting plaster that picks up detail well. Lightweight versions also exist and are easier on scenery.
  • Mixing container and stir stick. Disposable plastic tubs work well. Flexible ones allow you to crack out hardened plaster after use.
  • Water, plus a spray bottle with a drop of dish soap.
  • Latex construction adhesive or similar, to fix the castings in place.
  • Sculptamold or more plaster, for filling gaps.
  • Acrylic paints, brushes and paper towels.
  • A razor saw or hobby knife, for cutting castings.

Buying or making moulds

Commercial moulds are the easiest start. They come in many sizes, can last for years with care, and are inexpensive compared with the time it takes to make your own.

If you want to make your own, you can use latex mould compound on a real rock whose surface looks like the texture you want. Broadly, the process is:

  1. Wash and clean the rock, and leave it slightly damp.
  2. Brush on a thin coat of mould compound, working it into crevices without letting it puddle.
  3. Let each coat dry fully before adding the next. Several coats are used.
  4. Reinforce a middle layer with gauze or cheesecloth for strength.
  5. Add a final coat to cover the weave, let it dry, then peel off the mould carefully, starting at one corner.

Follow the instructions on your particular product. Rock sources vary: look for weathered pieces with strong layering, and do not take rock from places where it is not allowed.

Method 1: straight casting

In straight casting, you cast the rock in the mould, let it harden, and remove it to install later. This is the easier method for a first attempt.

  1. Prepare the mould. Put the mould on a flat surface. Dampen the inside with a mist or a quick rinse and shake off the excess, so the plaster flows into the detail. Avoid leaving pools of water.
  2. Mix the plaster. Add plaster to water, not the other way around, and stir to a pourable consistency, a little like a thick soup or pancake batter. Too much water weakens the casting and may stop it setting properly.
  3. Pour and settle. Fill the mould, and tap or use a stick to push plaster into corners.
  4. Wait. Working time is short, often only a few minutes, and many products set in tens of minutes. Check the label on your plaster.
  5. Demould. When the plaster has hardened, and often when it feels cool or warm to the touch as noted by the product, peel the mould away.
  6. Cure. Leave the casting to dry fully, often overnight.

Method 2: casting in place

In casting in place, you fill the mould with plaster and, once it starts to thicken but is still soft, press it directly on to the prepared scenery. This lets the rock wrap around odd shapes, and it eliminates the step of gluing the casting afterwards.

  1. Dampen the scenery surface where the casting will go. A mist of soapy water stops dry foam or plaster from sucking water out of the casting.
  2. Fill the mould as above, then wait until the plaster begins to set but is still soft.
  3. Press the mould against the scenery, and hold it, including the edges. The edges are the part most likely to stick out.
  4. Test the set. Lift an edge. If the plaster stays on the scenery, the mould can be released; if it stays in the mould, hold a little longer.
  5. Peel the mould back slowly. If it catches under an edge, stretch the rubber, or break a little plaster away.

Because timing matters, practise on scrap board before using this method on your layout.

Installing and blending

  • Glue straight castings to the scenery with latex construction adhesive or a similar product. Hold or prop them until the glue grabs.
  • Cut to fit. Hydrocal can be cut with a razor saw or knife, or scored and snapped for straight cuts, so one casting can make several smaller pieces.
  • Re-use castings and moulds. Turn castings upside down or stagger them so the repetition is not obvious. Rotating the mould between pours also helps. Rock faces in nature often have repeating patterns, so a family resemblance is not a problem.
  • Overlap edges slightly, and fill gaps with Sculptamold or plaster.
  • Wrap and bend. Flexible moulds can be bent over a ridge or into a valley.
  • Blend the top and bottom. Add earth, ground cover and trees at the top and base of the rock, so it looks like a natural outcrop and not a pasted-on panel.

Rock faces work well around tunnel portals, beside streams (see model railroad water), and in western and mountain scenes, including HOn3 narrow gauge and logging layouts; see themed layouts for ideas.

Colouring the rock

Many modellers colour plaster rock with thinned acrylic washes, building from light to dark. Real photographs of the rock in your chosen region are very helpful.

  1. Base coat. Mix an earthy base colour, such as a tan, grey or brown, with plenty of water to make a runny stain. Brush it over the casting. If it is too dark, dab with a paper towel while still wet.
  2. Shadows. Add a darker stain, such as dark brown or black, and dribble a little into cracks and crevices. Use less than you think.
  3. Highlights. Once dry, drybrush a light grey or off-white across raised edges for definition. Drybrushing means loading the brush, wiping nearly all the paint off on a paper towel, then lightly brushing the surface.
  4. Vary the colour. Add subtle variation, such as rusty streaks or greenish tints, but keep it restrained.

Troubleshooting

  • Plaster ran off the scenery. It was mixed too thin or placed too early.
  • Cracked casting. It may have set too long before pressing. Small cracks can look natural, or be patched.
  • Edges sticking out. The edges were not pressed and held, or the plaster was too hard.
  • Weak, crumbly casting. Too much water in the mix.
  • Surface bubbles or air pockets. Tap the mould, and work plaster into detail with a stick.
  • Sharp repeating pattern. Rotate or flip castings and vary the mould.

Safety and cleanup

Plaster powder is a fine dust. Avoid breathing it in, and consider a dust mask when mixing and sanding, working in a ventilated area. Do not pour leftover plaster down a sink, as it can set in the pipes. Let it harden in the container and dispose of it with household waste. Wash tools promptly, and flex the mould to remove residue.

For how rock fits into the full sequence of landforms, paint and ground cover, see the DIY model railroad scenery guide.

The complete guide to scenery and structures

DIY Model Railroad Scenery: A Beginner's Guide
Read the guide

Keep exploring

Guides from other topics

All topics →